Essay: Construction Project Management

Pages: 2 (603 words)  ·  Bibliography Sources: 0  ·  Level: College Junior  ·  Topic: Architecture  ·  Buy This Paper

¶ … Hearst Tower on 57th and 8th in Midtown Manhattan

The Hearst Corporation is a media conglomerate that owns or controls newspapers, magazines, television stations, and cable networks. The company has been around since the early 20th century, and so has the base of the building, which was built in 1928 at the cost of $2 million then. The base of the building is a designated historic landmark. It has six stories, and comprises 40,000 square feet. Originally, a skyscraper was intended to emerge from the six-story building but the Great Depression caused the Hearst Corporation to postpone the project. It was postponed until 2006. The new tower built in 2006 was the first to be built in Manhattan since the terrorist attacks of September 11. The finished product is 46 stories tall, and offers 860,000 square feet of office space. Its defining external feature is its diagrid, made of 9500 metric tons of structural steel. It received the Emporis Skyscraper Award in 2006, the year it was completed. Moreover, the Hearst Tower is of note because it was the first "green" high rise office building in New York City. The Hearst Tower was constructed around the historical facade, a design approved by the Landmark Preservation Commission. The tower cost about $500 million to construct.

LEED Gold and Platinum Designations

The diagrid construction permits a great deal of external light to penetrate the offices inside, reducing dependence on artificially powered light. The building uses 26% less energy than the minimum average in the city. Special "low-E" windows also contribute to maximal external light, but also minimize the input of heat radiation to keep the building cool and prevent the need for air conditioning. In addition to being "green," the building's high degree of natural light is also beneficial for workplace… [END OF PREVIEW]

Four Different Ordering Options:

?
Which Option Should I Choose?

1.  Buy the full, 2-page paper:  $28.88

or

2.  Buy + remove from all search engines
(Google, Yahoo, Bing) for 30 days:  $38.88

or

3.  Access all 175,000+ papers:  $41.97/mo

(Already a member?  Click to download the paper!)

or

4.  Let us write a NEW paper for you!

Ask Us to Write a New Paper
Most popular!

Project Management for Construction Essay


Construction Project Risk Management Research Paper


Impact of Project Management Strategies on the Acquisition of International Contracts Research Proposal


Project Management in the Oil Industry Thesis


Construction Project Management Research Proposal


View 1,000+ other related papers  >>

Cite This Essay:

APA Format

Construction Project Management.  (2013, April 24).  Retrieved May 23, 2019, from https://www.essaytown.com/subjects/paper/construction-project-management/9348784

MLA Format

"Construction Project Management."  24 April 2013.  Web.  23 May 2019. <https://www.essaytown.com/subjects/paper/construction-project-management/9348784>.

Chicago Format

"Construction Project Management."  Essaytown.com.  April 24, 2013.  Accessed May 23, 2019.
https://www.essaytown.com/subjects/paper/construction-project-management/9348784.