The work of Rushton, Oxley, and Croucher (2000) entitled: "The Handbook of Logistics and Distribution Management" states that the scheduling problems of vehicle routing are "relatively complicated." P.422. The reasons for this are stated to be that first of all "the different types of problems that can arise each "needs to be understood and approached in a different way" and secondly "the many detailed aspects that need to be taken into account and the various methods of algorithms that can be used to produce solutions." (Rushton, Oxley and Croucher, 2000) p.422 Problems may be of the nature of:

(1) Strategic;

(2) Tactical or operational;

(3) Interactive; and (4) Planning. (2000)

Strategic problems are concerned "with the longer-term aspects of vehicle routing and scheduling, in particular where there is a regular delivery of similar products and quantities to fixed or regular customers." (Rushton, Oxley and Croucher, 2000) Stated as typical examples are "most retail delivery operations (such as grocery multiples), bread delivery and beer delivery to 'tied' houses." (Rushton, Oxley and Croucher, 2000)

Stated as the primary characteristic is that of "a fairly regular demand being delivered to virtually the same locations. Thus it is possible to derive vehicle schedules that can be fixed for a certain period of time (eg three to six months). Tactical or operational problems are stated by Rushton, Oxton and Croucher (2000) to be concerned with routes that have to be scheduled on a weekly or daily basis" and is a type of scheduling that generally is accomplished through parcel delivery companies or by companies that supply parts or contract haul companies working for various clients.

Rushton, Oxley and Croucher state that the primary factor of importance is that "either the demand (quantity) of goods cannot be estimated (random demand) or the location of delivery points varies. Also it is possible that both of these incidents simultaneously occur. Therefore, it is near impossible or at the very least extremely difficult for delivery schedules to be planned on the basis of historical information. Instead the requirement is that each series of orders be viewed on the basis of daily or weekly scheduling and that the routes and schedules be flexible to "this ever changing demand." (Rushton, Oxley and Croucher, 2000)

Many times scheduling of this nature is accomplished by a manual load planner or computer applications that enable 'live scheduling'. (Rushton, Oxley and Croucher, 2000, paraphrased) Scheduling is now planned on what is known as an interactive basis and this allows the use of a computer by the scheduler to plan the most effective and efficient routes. This process uses the actual demand data rather than historical demand. This method of scheduling is known to be that which uses 'real-time' data therefore the result is formulation of routes that are more accurate.

All routes are not scheduled in this manner due to the cost barriers of these types of routing and scheduling systems. When schedules are formulated with real-time data the routes experience variation each day since the computer has the capacity to "…reappraise demand requirements and come up with a completely original result each time." (Rushton, Oxley and Croucher, 2000) Stated as a primary benefit of the interactive approach is the scheduler's ability to make changes to routes if need be. The example stated is that in the case where an urgent order is received after route scheduling the scheduler is able to manually input the order and then to assign the order to an already existing route.

Upon entry of an order into the system it may be rejected and for various reasons include:

(1) Insufficient capacity left on the vehicle;

(2) Insufficient time available; and (3) Other various reasons. (Rushton, Oxley and Croucher, 2000)

Therefore the scheduler is able to ensure that the item is placed on the route of a vehicle that will most assuredly complete the delivery. This cuts out the additional expenses incurred by shipments that never complete delivery and that bring the item back to the beginning point needlessly consuming space on the vehicle. Also noted as a problem relating to routing and scheduling is that of "the planning and measurement of the effect of change." (Rushton, Oxley and Croucher, 2000)

Computer-based techniques are accredited for touring and scheduling coming into its own as the computer models have the capacity for use in testing or simulations of the change in demand and its effect on vehicle availability and so forth and is known as "what-if planning" (Rushton, Oxley and Croucher, 2000) One such example stated by Rushton, Oxley and Croucher (2000) that third-party contractors generally use routing and scheduling packages to assist them in response to invitations "to tender for business" and the package enable the identification of the fleet and driver requirements and ultimately they cost out the operation accordingly. (Paraphrased)

In addition to the basic demand data and the routing and scheduling are the following primary areas:

(1) Demand data;

(2) distance factors;

(3) Customer and service constraints;

(4) Vehicle restrictions;

(5) Driver constraints;

6) Route factors; and (7) product/unit load constraints. (Rushton, Oxley and Croucher, 2000)

The demand data is however, stated to be the most important of all data and in fact "can often be the most difficult data item to collect, will certainly be the most time consuming and will also require the most manipulation and clarification prior to use within the manual method or computer package." (Rushton, Oxley and Croucher, 2000) Additional analyses may well be necessary "to take account of peak demand periods because they are likely to require different schedules." (Rushton, Oxley and Croucher, 2000) Demand data can be represented in several ways and this is stated to be fortunate since "the most appropriate choice of data is not available, so second or even third choice has to be sufficient." (Rushton, Oxley and Croucher, 2000)

Stated as the 'key' requirement for the collection of data is that it is "collected to be representative of the main measure of the vehicle capacity constraint. This might be weight-, volume- or unit-related." (Rushton, Oxley and Croucher, 2000) Examples stated include the following:

(1) weight (per product type delivered or as a total delivered tonnage figure in kilograms or tonnes);

(2) Cube or volume (in cubic metres or cubic feet);

(3) Carton/Case/parcel (numbers to be delivered -- common in retail distribution); (4) Unit load (eg numbers of pallets or roll cages-again common in retail distribution);

(5) Value in revenue or sales (rarely appropriate because of the problem of interpreting value as a physical measure); (6) Product item (generally too detailed); and (7) Product group. (Rushton, Oxley and Croucher, 2000)

Demand data also can be classified by location in various ways. It is clear that the "level of detail and accuracy is very important in order to ensure good results from the scheduling process." (Rushton, Oxley and Croucher, 2000) it is related that some computer packages are "more amenable to some classifications than others" and that the best choice is generally the "classification that is in general use within the company." (Rushton, Oxley and Croucher, 2000) Primary alternatives include the following:

(1) post- or zip codes;

(2) Ordnance Survey codes or any other type of map referencing system;

(3) 10-kilometre grid squares -- useful simplification of map referencing system;

(4) Gazetter (main town or city) rather impressive but easily recognizable;

(5) Latitude and longitude -- again, may not be sufficiently precise;

(6) Population-based -- can be a good approximation if there is no other data available; and (7) Plumbly management bricks (a marketing, sales-based system of identifying sales areas). (Rushton, Oxley and Croucher, 2000)

Various methods are used in the estimations of distance traveling in conducting marketing and scheduling analysis. Stated as the three primary methods of measurement are the following:

(1) True distance method -- all actual distances are physically measured on a road map. This is a time-consuming task and one that could not be performed for large applications; (2) Coordinate method -- customer and delivery points are located on a map and the mapped; and (3) Digitized road network -- computer modeling system application.

Stated as customer and service constraints are the following factors:

(1) specified times for delivery;

(2) specified delivery windows;

(3) early closing days;

(4) lunch breaks;

(5) access restrictions;

(6) unloading restrictions;

(7) drop size limitation; and (8) parking problems. (Rushton, Oxley and Croucher, 2000)

The work of Vural (2003) entitled: "A GA-Based Meta-Heuristic for Capacitated Vehicle Routing Problem with Simultaneous Pick-up and Deliveries" states that the vehicle routing problem is represented as the following graph theoretic problem:

"Let G = (V, a) be a complete graph where V = {0, 1, & #8230;, n} is the vertex set and a is the arc set. Vertices j = 1, & #8230;, n correspond to the customers, each with a known non-negative demand, dj, to be delivered whereas vertex 0 correspond to the depot. A non-negative cost, cij, is associated with each arc (i, j) ?… [END OF PREVIEW]

Two Ordering Options:

?
Which Option Should I Choose?
1.  Buy full paper (12 pages)Download Microsoft Word File

Download the perfectly formatted MS Word file!

- or -

2.  Write a NEW paper for me!✍🏻

We'll follow your exact instructions!
Chat with the writer 24/7.

Building Partnership Capacity and Logistics Essay


Supply Chain Planning Under Uncertainty a Real Options Approach Research Proposal


Halliburton Management Analysis in Analyzing the Strategic Thesis


Commanders Tactical Problem Assessment


Advanced Persistent Threat Research Paper


View 69 other related papers  >>

Cite This Research Proposal:

APA Format

Logistics Tactical and Strategic Planning.  (2009, August 25).  Retrieved January 20, 2020, from https://www.essaytown.com/subjects/paper/logistics-tactical-strategic-planning/78594

MLA Format

"Logistics Tactical and Strategic Planning."  25 August 2009.  Web.  20 January 2020. <https://www.essaytown.com/subjects/paper/logistics-tactical-strategic-planning/78594>.

Chicago Format

"Logistics Tactical and Strategic Planning."  Essaytown.com.  August 25, 2009.  Accessed January 20, 2020.
https://www.essaytown.com/subjects/paper/logistics-tactical-strategic-planning/78594.